Central Coast Boardwalk Project Improves Terrigal Experience.

The Project & Challenge.

The Central Coast Boardwalk project and rockpool restoration, jointly funded by Central Coast Council and the NSW Government will deliver an improved pedestrian experience between Terrigal Beach Promenade and The Haven. The route follows the headland allowing the community to an enjoy an ocean front walk.

All elevated boardwalks require pillars to be set deep in the earth, with this project no exception. The major challenge was commencing construction and drilling into the ocean bed at low tides and in between waves. To avoid construction setbacks, machinery had to be of the highest quality supplied with a range of excavator attachments required to get the desired workload complete each shift.

Challenges involved in such a large-scale project included:

  • Site health & safety,
  • Environmental impacts
  • Operator efficiency & Earthmoving Machine Availability
  • Timing of excavation, tidal specific

The Solution:
Solution Plant Hire were available 24/7 to support this project and supplied on of their 23 tonne CASE Excavators, with attachments including buckets, augers, extensions and auger drives. The availability of this equipment allowed multiple benefits for the customer including on-time project delivery, reliable equipment and effective time management on the project.